Benefits
Progress Measurement
1
Progress Measurement
What solution or tool do you have for determining the exact percentage of progress in the work of stress analysis in the project?
Borna iDEESStress Analysis Progress Measurement
2
Stress Analysis Progress Measurement
What solution or tool do you have for determining the exact percentage of progress in the work of stress analysis in the project?
Borna iDEESSupporting Progress Measurement
3
Supporting Progress Measurement
What solution or tool do you have for determining the exact percentage of progress in the work of supporting in the project?
Spent Man-Hours
4
Spent Man-Hours
What strategy or tool do you have for determining the exact spent Man-Hours on your team in detail?
Man-Hour Estimation
5
Man-Hour Estimation
What strategy or tool do you have about the estimation of Man-Hours in a new project on your team in detail?
Borna iDEESMissed Items Management
6
Missed Items Management
What tools or software do you use to manage, record, and resolve the Missed Items in the 3D Model, that have been long time unresolved?
Borna iDEESIsometrics Measurement
7
Isometrics Measurement
What tools or method do you usually use to manage the isometric transmissions, their revisions, and their history?
Isometrics Revision Management
8
Isometrics Revision Management
Every time you transmit isometrics, How many Man-Hours do you spend to determine which line is sent with what revision and what is the next revision?
Borna iDEESHistory Management
9
History Management
What tools or software are available to manage and record work history on lines, equipment, documents and structures on the 3D model from the start of the project?
Borna iDEESDesign Changes Management #1
10
Design Changes Management #1
What software or strategy do you use to control this big problem that the design team after the stress analysis team, has changed the design of the lines without coordination?
Borna iDEESDesign Changes Management #2
11
Design Changes Management #2
What software or strategy do you use to control this big problem that the design team after supporting, has changed the design of the lines without coordination?
Borna iDEESDesign Changes Management #3
12
Design Changes Management #3
What software or strategy do you use to deal with this big problem that the design team after the final isometric Issue, has changed the design of the lines without coordination?
Borna iDEESEngineering job Front
13
Engineering job Front
If you want to provide a detailed report showing which lines of the Line List and how much it worked on, and which lines did not work at all, what software or strategy would you use?
Borna iDEESMaster Document Management
14
Master Document Management
What strategy or method do you use to collect P&ID comments from the team members at the various points of the project and send it to a relevant discipline on a file?
Borna iDEESSupport Bill Of Quantity
15
Support Bill Of Quantity
Have you ever thought that if you had a software that automatically outputs 3D Model and gives you the list of materials in piping supports, total weight and color surface area can be given in a few minutes, How much did you save on project time?
Borna iDEESMOM Management
16
MOM Management
What software or method do you use to manage integrated related MOMs ? Have you ever encountered any problems?